Make sound and timely decisions
The leader must be able to rapidly estimate a situation and make a sound decision based on that estimation. Hesitation or reluctance to make a decision leads subordinates to lose confidence in your abilities as a leader.
Back to the universal principles
Calibration
Under, just right, over.
| Situation | Under | Just Right | Over |
|---|---|---|---|
| Someone junior has the fact | Treats rank as the argument and keeps the original call. | Lets the fact win in the room, says what changed, and moves the decision. | Opens a second debate after the fact is already in, so the team leaves with no call. |
| A room that already agrees | Takes the agreement as proof and locks the path. | Asks who would bet against it, and what evidence would change the call, before locking it. | Keeps hunting dissent after a real objection has been answered, and the work waits. |
| A question the data can settle | Runs the meeting on opinions when a test or the arithmetic would settle it. | Runs the test or does the math, and uses judgment only for the part that remains. | Refuses to decide the leftover until every unknown is gone, including ones that do not change the call. |
| You were wrong last week | Hopes nobody notices, or defends the old call so it still looks consistent. | Says the miss in the same week, names the better path, and switches to it. | Spends the week narrating the miss and does not make the next call. |
| A hunch after the fact showed up | Drops the hunch at the first objection and asks someone else to decide. | Names the hunch, the fact that cuts against it, and which one the decision now follows. | Keeps the hunch after the fact has cut it down, and calls that instinct. |
| Defending the plan you already announced | Treats the announcement as the reason to stay, and argues with the new evidence. | Updates the plan in public and says which assumption was wrong. | Reverses the plan on every new comment, so nobody can tell which evidence mattered. |
| A thread that needs a decision | Lets the thread sit. People keep adding comments instead of making a call. | Names the decision, picks a reversible option with the information already in the thread, and writes what would change it. | Closes the thread with a snap decision that ignores a constraint someone already raised there. The team spends the rest of the week undoing the work. |
| Another round of research | Starts more research when the open questions would not change this week's action. | Stops the research once it will not move the decision, starts the reversible work, and leaves a note on what is still unknown. | Skips the afternoon of research that would have answered the one real risk. Someone else has to clean up the mistake. |
| Unblocking yourself | Waits for the owner to return before touching work that is stuck. Nothing moves for the week. | Tries a cheap path that can be reversed, and tells the owner what they did. | Forces a path the owner had already ruled out. The owner spends their first day back cleaning it up. |
| The plan breaks midweek | Freezes until a new plan is approved. The remaining days are spent waiting. | Picks a next step that is cheap to try and easy to reverse, and tells the people who were working on the old plan. | Scraps the plan and starts a new one the same day without checking who is already partway through the old one. Their work no longer fits. |
| One more review before acting | Adds another review because it feels safer. The action waits for a slot that is not this week. | Takes the review that would catch a mistake that is hard to undo, and skips the rest so the work can start. | Skips the review that was going to catch a known risk. The people who would have flagged it find out after the cost is real. |
| A choice that can be undone | Treats a reversible choice like a strategy decision. Days go to alignment the choice does not need. | Picks one, starts, and watches. Changes it if the first days show it is wrong. | Flips the choice twice in one week. People stop trusting the direction and redo work each time. |
| Work that is ready enough to share | Holds the draft until it is polished. Reviewers have nothing to react to this week. | Shares the rough version early enough that feedback can still change it, and says what is still unfinished. | Sends half formed work to a wide list so it looks like progress. People spend time commenting on parts they already knew were wrong. |
| A small fix in front of you | Files it for later and lives with the friction for the rest of the week. | Fixes the reversible part now, and leaves a note if a larger change still needs a decision. | Reworks the surrounding process in the same sitting. People who used the old path are surprised and lose time. |
Further reading
Sources and essays on this principle.
- Officership Foundations, The Basic School
The published wording of this principle, in numbered doctrine order.
marines.mil
- MCWP 6-10 Leading Marines
Doctrine that covers the leadership principles and the traits they rest on.
marines.mil
- MCDP 6 Command and Control
The doctrine for reaching a sound decision faster than the other side.
marines.mil
See something wrong or missing? Fix it in Facet.